Home / Guides / A CFO's guide to the diesel generator line in your budget

A CFO's guide to the diesel generator line in your budget

Diesel backup is an operating cost that comes back every year with no ceiling. This is how to measure it, compare it with a one-time battery, and plan the decision before the next season of power cuts.

Vyut guide · updated 19 October 2026

Most finance teams see diesel as one line: litres bought, rupees paid, month after month. It rarely gets the scrutiny that a capital purchase gets, because nobody signed for it once. It simply recurs. At a plant spending ₹30 lakh a month on diesel, that line is ₹3.6 crore a year, every year, with no ceiling and no asset at the end of it.

This guide is for the person who has to plan that line: how to measure what it really costs, how to compare it with a one-time purchase that takes part of it away, and why the timing of the decision matters as much as the decision.

What does the diesel line actually buy?

Diesel buys units of electricity (kWh) during power cuts. The useful number for planning is therefore not the monthly spend but the cost per unit. At our reference plant (diesel at ₹95.20 a litre, the set at 60 percent load burning about 0.27 litres per unit, and about ₹2 a unit for oil and maintenance) one unit from the genset costs about ₹27.70. The same unit bought from the grid and stored in a battery costs about ₹11.61.

Your own figure needs two numbers your plant already has: litres of diesel bought for the set over twelve months, and units it generated over the same period. Our guide to working out your DG cost per unit shows the arithmetic, and our table of 32 industrial belts shows how the figure moves with the local diesel price.

Which part of the diesel bill can be removed?

Not all of it, and a plan that assumes all of it will disappoint. Roughly half the energy a genset makes in a year comes from short power cuts. A battery beside the genset takes those in full. The long cuts are rarer and run for hours; covering them with a bigger battery costs about two and a half times the money for a worse return. The genset stays for them, and for the fire pump and the lift.

So the planning assumption is a cut of roughly half the diesel bill at a typical plant, not the whole of it. Our three reference cases on the home page show diesel bill cuts of 43.8 to 45.3 percent. Your own share comes from your plant's power cut pattern, which is why measurement comes before any figure in writing.

How does a one-time purchase compare with a decade of diesel?

The shape of the comparison is simple. The system costs less than a year of what the plant spends on diesel today, and it removes roughly half of that spend every year after, for a thirteen-year asset life at a typical cycle count.

Reference caseDiesel a monthNet saving a yearPayback
A: auto components, NCR feeder₹15 lakh₹50.1 lakh3.2 years
B: light engineering, two shifts₹30 lakh₹1.01 crore3.1 years
C: longer power cuts₹50 lakh₹1.73 crore3.0 years

These are modelled reference sites, not quotes. Larger plants pay back a little faster because the fixed costs of approvals and commissioning spread further. The savings calculator shows the year-by-year cash position for your own inputs, including the year in which the cumulative saving passes the purchase price.

What payback should a CFO accept?

We work to three bands and say which one a site is in:

How should the purchase be financed?

Vyut sells the system outright. The plant owns it from day one, with no lien and no multi-year contract over its electrical system, and your own CA confirms the depreciation treatment on your books. If you would rather finance it through your bank, the calculator shows the EMI on your terms, so the board conversation becomes a monthly EMI set against the monthly diesel it removes.

Some offers in the market are structured as zero investment: the plant pays per unit for years and someone else owns the equipment. That can suit a plant that cannot take an asset on its balance sheet. It is a different trade, and worth comparing on total cost over the asset's life.

How exposed is the plan to the diesel price?

The saving is the difference between a diesel unit and a stored grid unit, so it moves with the diesel price. As a planning rule, a fall of about ₹20 a litre adds roughly a year to payback. That is why the guarantee carries a diesel price floor and re-bases to the new price rather than vanishing, and why the contract says so in writing. A rise in diesel works the other way.

The grid tariff matters too, but less: it is the cost of refilling the battery. Use your total bill divided by units billed, not the energy charge alone, or the saving will look larger than it is. Our guide to maximum demand charges and a battery covers the one tariff line that can surprise a plan.

Why does the timing matter?

A decision made in the middle of a bad run of power cuts is a decision made under pressure, after that run's diesel has already been bought. In the NCR, the winter pollution season also brings GRAP orders, and it is worth knowing before then that your genset meets the rules for running as a backup (our GRAP guide sets them out).

The path is short but it has steps, and each needs a few weeks:

  1. An indicative model from the calculator, today.
  2. A measured baseline at our cost in weeks 1 and 2: the DG controller's start counter and engine hours, the logbook, twelve months of diesel invoices and electricity bills.
  3. A verified proposal in week 3, with the guarantee where the payback allows it.
  4. Deploy and commission in week 4, subject to the units being in stock and to the electrical inspectorate's approvals.

Starting before the season means the battery carries the cuts that the plan was built on.

What should finance ask for before signing anything?

Next step

Run your own numbers in the savings calculator: six inputs and the full working, including when it advises against going further. If the figures look worth checking, we read your DG controller free, in about ten minutes at the panel, and send you the result either way. Our questions page covers the rest.

What would it save your plant?

The savings calculator runs on your diesel spend and your belt's diesel price and shows the full working, including when the answer is no.

More guides

Battery energy storage for factories in India: a plain guideWhat a commercial and industrial battery is, how long it lasts, how it takes over when the grid fails, how it should be sized, what the CEA's new safety rules require, and how buying one works.Battery storage vs diesel generator: why a factory needs bothA battery is instant and costs far less per unit. A genset runs for as long as there is fuel. For most factories the right answer is the battery for short cuts and the genset for long ones.What does a unit from your DG set really cost?About ₹27.70 a kWh at our reference plant, against ₹10 for grid power. Here is the arithmetic behind that figure and how to work out your own from litres and kWh.How to read your DG set's start counter and engine hoursTwo numbers on your generator's controller tell you how often your power fails and how long it stays off. Here is where to find them, the arithmetic, and the corrections that keep it honest.