GRAP and diesel generators in Delhi NCR: what the rules say now

Checked against CAQM's own documents on 11 October 2026. DG rules now sit in GRAP Stage I, compliant sets carry no daily hour limit, and older sets need dual fuel or a certified emission control device, depending on size.

Vyut guide · updated 11 October 2026

Every winter, plant heads across the NCR ask the same question: can we run the genset when GRAP is on? The answer has changed several times since 2021, and a lot of what is still repeated online describes rules that have since been replaced. This guide sets out what the current documents from the Commission for Air Quality Management (CAQM) actually say, with a link to each one.

Checked on 11 October 2026 against the documents linked below. GRAP may or may not be in force on any given day, and whether a rule applies to your set depends on its size, fuel and emission controls. Directions are amended from time to time, and your own consent to operate from the state pollution control board can carry conditions of its own, so treat this as a plain reading of the public documents, not legal advice.

What is GRAP and how is each stage triggered?

The Graded Response Action Plan is CAQM's emergency schedule for the whole NCR. It has four stages, set by Delhi's air quality index (AQI), according to the GRAP schedule as revised on 29 September 2026:

StageAir qualityDelhi AQI
Stage IPoor201 to 300
Stage IIVery Poor301 to 400
Stage IIISevere401 to 450
Stage IVSevere+Above 450

Stages are invoked by order of CAQM's Sub-Committee on GRAP, often in advance on the strength of IMD and IITM forecasts, and the actions of earlier stages continue when a higher stage is invoked. They are also revoked: Stage I was revoked across the NCR on 16 March 2026 when the AQI improved. The current schedule was issued with immediate effect by CAQM Direction No. 104 of 29 September 2026, which says its measures apply as and when each stage is invoked. To see which stage is in force today, check the GRAP pages of CAQM's website; we have not stated it here because it changes with the air.

What does GRAP now say about diesel generators?

The September 2026 revision, approved at the Commission's meeting of 28 September and announced in a PIB release of 29 September 2026, moved the actions on DG sets from Stage II to Stage I. DG rules are now enforced from the first stage, when the air is merely "Poor". (The November 2025 revision had already moved the action on uninterrupted power supply to Stage I.)

Stage I of the current schedule contains three DG-related actions, quoted here as written:

Stages II to IV add no separate DG action, so once Stage I is invoked these apply at every stage above it. The citizens' charter in the same schedule also asks people to avoid using DG sets except for essential activities.

Which DG sets may run, and on what conditions?

The detail lives in CAQM Direction No. 76 of 29 September 2023. It replaced all earlier DG directions and set a schedule for operating DG sets "only as a backup against regular power supply failures" across every sector in the NCR, in force from 1 October 2023 (summarised in this PIB release of 29 September 2023). It was amended on 22 February 2024 and again on 11 December 2024, as certified retrofit emission control devices (RECDs) became available for smaller sets, lowering the RECD band's lower limit from 125 kW to 61 kW and then to 41 kW. The 2026 GRAP schedule reproduces the result:

DG setEmission control requiredUse
Gas gensets of any size (LPG, natural gas, biogas, propane, butane)NoneNo restrictions
Up to 800 kW (1000 kVA), built to MoEFCC notification GSR 804(E) of 3 November 2022NoneNo restrictions
Older sets, 800 kW (1000 kVA) and aboveAny emission control system, subject to the stack emission standards in Direction 76No restrictions
Older sets, 41 kW (51 kVA) to under 800 kWDual fuel mode, or a retrofitted emission control device through certified agenciesNo restrictions
Older sets, 19 kW (23 kVA) to under 41 kWDual fuel modeNo restrictions; a set not on dual fuel only because gas is unavailable may run for the listed emergency services only
Portable sets below 19 kW (23 kVA)None availableNot generally permitted; listed emergency services only

Three points that matter to a factory:

The schedule gives no permission to run an older set in the 41 to 800 kW band that has neither dual fuel nor a certified RECD. If your set is in that position, settle it with your state pollution control board before the season rather than during it.

Is there still a two-hour daily limit on DG sets during GRAP?

Not in the current documents. You will still see the two-hour figure quoted, and it did exist:

Direction 76 replaced both "in supersession of all extant directions / orders / guidelines on the regulations for DG sets", and for every compliant category its schedule reads "No restrictions (Even during periods under GRAP)". The 2026 GRAP schedule carries the same entries and sets no hour limit for DG sets at any stage. We found no current CAQM document that reinstates a daily cap. If your consent to operate or a state order says otherwise, that governs your site.

Where does a battery fit under GRAP?

A battery has no exhaust. The DG schedule regulates generating sets by fuel and emission control, and neither it nor the GRAP actions address battery storage. What a battery beside the genset changes is how often the genset is asked to run.

What a battery does not do: change your genset's compliance status. The genset stays on site for long cuts, the fire pump and the lift, so it still needs whatever emission control its category requires. Plan any retrofit on its own merits, not around a battery. Our guide on battery storage vs a diesel generator explains why the genset stays.

What should an NCR plant check before the season?

  1. Your set's rating in kW and kVA, its year of manufacture, and whether it is built to GSR 804(E).
  2. For an older set: dual fuel or a certified RECD in place, with the certification papers on file.
  3. For 800 kW and above: recent stack monitoring results and the stack height, against Direction 76.
  4. Your consent to operate, for any DG conditions of its own.
  5. A dated record of mains failures. The current schedule does not demand one, but the controller's start counter and an AMF logbook are the simplest proof that the set ran only as a backup. Our guide to reading the start counter and engine hours shows how.
  6. Which GRAP stage is in force, from CAQM's website, through the season.

Know your own numbers before the season

Our savings calculator loads the diesel price for your industrial belt, and shows the full working of what a battery for the short cuts would save, including when it advises against going further. Our location pages cover the NCR belts individually.

We will also read your DG controller's start counter and engine hours for free, in about ten minutes at the panel, so you know how often your power actually fails before the winter starts. The data is yours either way. Call or WhatsApp +91 8920 110 530, or write to contact@vyut.in.

What would it save your plant?

The savings calculator runs on your diesel spend and your belt's diesel price and shows the full working, including when the answer is no.

More guides

Battery energy storage for factories in India: a plain guideWhat a commercial and industrial battery is, how long it lasts, how it takes over when the grid fails, how it should be sized, what the CEA's new safety rules require, and how buying one works.Battery storage vs diesel generator: why a factory needs bothA battery is instant and costs far less per unit. A genset runs for as long as there is fuel. For most factories the right answer is the battery for short cuts and the genset for long ones.What does a unit from your DG set really cost?About ₹27.70 a kWh at our reference plant, against ₹10 for grid power. Here is the arithmetic behind that figure and how to work out your own from litres and kWh.How to read your DG set's start counter and engine hoursTwo numbers on your generator's controller tell you how often your power fails and how long it stays off. Here is where to find them, the arithmetic, and the corrections that keep it honest.