About ₹27.70 a kWh at our reference plant, against ₹10 for grid power. Here is the arithmetic behind that figure and how to work out your own from litres and kWh.

Vyut guide · updated 11 October 2026

Ask a plant head what grid power costs and you get a number off the electricity bill. Ask what a unit from the DG set costs and you usually get the monthly diesel spend, which is a different thing. The diesel spend tells you how much money went into the tank. The cost per unit tells you how expensive each kWh was, and that is the number every decision about the genset should rest on: how to load it, whether to chase the DISCOM about the feeder, and whether battery storage makes sense at all.

This guide shows the figure we use, the assumptions behind it, and the arithmetic to redo it with your own invoices and your own controller readings.

The short answer: about ₹27.70 a unit at our reference plant

At our reference plant a unit from the genset costs about ₹27.70 once fuel, oil and maintenance are counted. The same unit bought from the grid and stored in a battery costs about ₹11.61. Every saving figure on our site starts from those two numbers.

The assumptions behind ₹27.70 are deliberately ordinary: diesel at ₹95.20 a litre (the reference price on our site, as at 22 August 2026), a set running at 60% of its rating, which burns about 0.27 litres for every kWh it makes, and ₹2.00 per kWh for everything other than fuel.

Line₹ per kWhHow it is worked out
Fuel₹25.70₹95.20 a litre x 0.27 litres per kWh
Oil, filters, AMC, overhaul₹2.00Spread over every kWh generated
All in₹27.70Fuel plus everything else

Your own figure will differ, mainly because of two things: the price on your diesel invoice and how hard your set is working. The rest of this guide shows how to find both.

How do I work out my own DG cost per unit?

You need two numbers for the same twelve months: litres of diesel bought for the set, and kWh the set generated. Twelve months matters, because one busy month or one quiet one will mislead you.

  1. Litres. Add up a year of diesel invoices for the DG set. Work in litres, not rupees, so a price change does not blur the picture. If your diesel figure includes AMC or operator charges, take those out first. Our calculator assumes they make up about 12% of a bill that includes them and strips them out.
  2. kWh generated. Many DG controllers keep a running kWh total. On ComAp panels it sits in the Statistics group, next to run hours and the start count. Note today's reading and compare it with one from a year ago, from the logbook or an old service report. If your panel shows no kWh, an energy meter on the DG feeder does the job. As a last resort, run hours multiplied by your average load during a cut gives a rough estimate.
  3. Divide. kWh divided by litres gives units per litre. Litres divided by kWh gives litres per kWh, which engineers call specific fuel consumption.
  4. Price it. Litres per kWh multiplied by your average invoice price per litre is your fuel cost per unit. Even simpler: rupees of fuel divided by kWh generated.
  5. Add the rest. Take a year of AMC charges, lube oil, filters, coolant, starter batteries and a provision for the next overhaul, and divide by the same kWh. If you do not have these to hand, ₹2.00 per kWh is the figure our model uses. Replace it with your own as soon as you can.

A worked example

Made-up round numbers, to show the method. A plant bought ₹1.2 crore of diesel last year at an average of ₹95.20 a litre, which is about 1,26,050 litres. Its controller's kWh total went up by 4,20,000 kWh over the same twelve months.

That plant pays roughly three times its grid price for every unit the genset makes, and more than our ₹27.70 reference, because its set burns 0.30 litres per kWh instead of 0.27. The reason is almost always the same one, and it is the subject of the next section.

Why does load factor change the cost of every unit?

A diesel engine is most efficient near its rated output and wasteful when it is lightly loaded. Most standby sets are oversized for the load they actually carry during a cut, and run at 30 to 40% of rating, where each unit costs more. Our model uses three reference points (0.300 litres per kWh at 40% load, 0.270 at 60% and 0.250 at 75%) and draws straight lines between them:

Load on the setLitres per kWhUnits per litreFuel cost at ₹95.20All in
30%0.3153.17₹29.99₹31.99
40%0.3003.33₹28.56₹30.56
60%0.2703.70₹25.70₹27.70
75%0.2504.00₹23.80₹25.80

Dropping from 60% to 30 or 40% load adds roughly ₹3 to ₹4 to every unit. Treat these as model reference points, not as your engine's curve: the OEM's data sheet gives the real one, and your own litres and kWh tell you where your set actually sits. If your units per litre come out well below 3.7, a lightly loaded set is the first suspect. Our guide on reducing diesel generator cost covers what to do about it.

What does the ₹2.00 for oil, maintenance and wear cover?

Fuel is most of the cost, but not all of it. Every hour the engine runs uses up lube oil and filters, adds to the hours the AMC is priced on, and brings the next overhaul closer. Spread across the units the set makes, our model carries all of that as ₹2.00 per kWh. Three things are worth knowing about it.

How does a diesel unit compare with grid power?

Grid power for a factory is not the headline slab rate. The number to compare with is your landed tariff: the whole electricity bill, including energy charge, demand charge, electricity duty and the fuel or power purchase adjustment, divided by the units billed. Our reference figure is ₹10.00 per kWh landed. An all-in industrial tariff below about ₹8.50 is uncommon, so if your arithmetic lands there, check whether you have taken the energy charge alone.

Source of the unit₹ per kWhWorking
Grid, used directly₹10.00Landed tariff at the reference plant
Grid, stored in a battery and used during a cut₹11.61₹10.00 ÷ 0.90 round-trip efficiency = ₹11.11, plus ₹0.50 battery upkeep
Diesel generator₹27.70₹25.70 fuel plus ₹2.00 oil and maintenance

A stored unit costs more than one straight from the grid, because about a tenth is lost going into the battery and coming back out (round-trip efficiency is 90% AC to AC, including the power conversion system) and the battery has its own upkeep. It also draws a few kilowatts for cooling and controls while it waits for the next cut, about 3 kW at the reference site, and that standby power is deducted from every saving we show. Even so, a stored unit costs well under half a diesel one.

That gap of roughly ₹16 to ₹17 a unit is why storage can pay for itself at a plant with frequent short power cuts, and why it cannot at a plant whose power rarely fails. A battery only earns when it is used. Chhote cuts battery lega, lambe cut genset, jaise aaj. Our guide on battery storage vs a diesel generator explains why the genset keeps the long ones.

What else belongs in the comparison?

Work out your own figure, or let us read the panel

Our savings calculator does all of this arithmetic for your plant. It loads the diesel price for your industrial belt, solves the load factor from your DG rating, and shows the all-in cost of a diesel unit, the cost of a stored grid unit and the spread between them, with the full working on the page. Six inputs, and it says plainly when it advises against going further.

If you would rather start from measured numbers than estimates, we will read your DG controller's start counter and engine hours for free. It takes about ten minutes at the panel with your maintenance engineer, the data stays yours, and you get the numbers whether or not you ever buy anything from us. Call or WhatsApp +91 8920 110 530, or write to contact@vyut.in. Answers to common questions are on our FAQ.

What would it save your plant?

The savings calculator runs on your diesel spend and your belt's diesel price and shows the full working, including when the answer is no.

More guides

Battery energy storage for factories in India: a plain guideWhat a commercial and industrial battery is, how long it lasts, how it takes over when the grid fails, how it should be sized, what the CEA's new safety rules require, and how buying one works.Battery storage vs diesel generator: why a factory needs bothA battery is instant and costs far less per unit. A genset runs for as long as there is fuel. For most factories the right answer is the battery for short cuts and the genset for long ones.How to read your DG set's start counter and engine hoursTwo numbers on your generator's controller tell you how often your power fails and how long it stays off. Here is where to find them, the arithmetic, and the corrections that keep it honest.GRAP and diesel generators in Delhi NCR: what the rules say nowChecked against CAQM's own documents on 11 October 2026. DG rules now sit in GRAP Stage I, compliant sets carry no daily hour limit, and older sets need dual fuel or a certified emission control device, depending on size.