How to find out how often the power fails at your factory
Your DISCOM's reliability indices, its outage reports, an RTI request for your feeder's record and the start counter on your own genset: what each one tells you and what it leaves out.
Ask a plant head how often the power goes and the answer is usually "roz", or "bahut zyada", or a shrug. That is not a criticism: nobody is asked to keep count. But the number matters. It decides how much diesel goes into short runs, whether a battery for the short cuts would ever pay for itself, and how hard to push the DISCOM about your feeder.
There are four places to look. Three of them sit with your DISCOM and its regulator. The fourth is on your own genset, and it is usually the best of the lot.
Why does the number of cuts matter more than the total hours?
Because a battery beside the genset earns only when it is used, and it can only be used once per cut. Two plants with the same diesel bill can be in very different positions: one burns its fuel in hundreds of short cuts that a battery would carry, the other in a handful of long ones it would not. Total hours of outage hide that difference. Frequency, together with the average length of a cut, shows it. Our guide on battery storage vs a diesel generator explains why the battery is sized for the short cuts and the genset keeps the long ones.
What are SAIFI and SAIDI, and what do they leave out?
They are the two reliability indices every Indian distribution licensee is meant to report. The Electricity (Rights of Consumers) Rules, 2020 require the licensee to supply power 24x7 and require each state commission to specify the System Average Interruption Frequency Index (SAIFI), the System Average Interruption Duration Index (SAIDI) and the minimum outage time, in minutes, that counts towards them (rule 10).
Delhi's version shows what the indices measure. Under the DERC Supply Code and Performance Standards Regulations, 2017, SAIFI is the number of consumers who experienced a sustained interruption divided by the total number of consumers, and SAIDI the sum of their interruption minutes divided by the same total. When calculating them the licensee leaves out:
- scheduled outages;
- momentary outages of five minutes or less;
- outages due to failure of the grid;
- outages caused by force majeure.
So a SAIFI figure is an average per consumer, across a whole licence area, of the longer unplanned cuts only. Your factory's changeover does not care about any of those exclusions. A three-minute dip starts the genset if it outlasts the controller's start delay; a planned shutdown on your feeder runs the genset just as an unplanned one does. A low SAIFI can sit beside a busy genset, and the two are not contradicting each other: they count different things. Other states set their own minimum durations and exclusions, which is the first thing to check before comparing any two figures.
What does my DISCOM already publish?
It varies a great deal by licensee. Some publish detailed monthly records; many publish little or nothing. As an example of the detailed end, BSES Yamuna Power posts a monthly outage report listing the interruptions it recorded, by area, with the start and restoration times and whether it was planned or unplanned, alongside monthly standards of performance formats under the Delhi supply code.
Read such a report for what it is: a record of the licensee's network, by area, not of your meter. In BSES Yamuna's August 2026 report, all but one of the 607 entries lasted 17 minutes or more. The brief interruptions that trip contactors and start gensets are not what a report like this is built to show.
Look on your DISCOM's website, under regulatory compliance, standards of performance or outages, and on the website of your state electricity regulatory commission. If you find reliability indices, note the minimum duration counted and whether planned outages are included before you use them.
How do I get my own feeder's interruption record?
The record that matters most is not an average at all: it is the interruption register, or tripping record, of the 11 kV or 33 kV feeder that supplies your plant. Start by asking for it at the sub-division or division office that looks after your connection. If it is not shared, the Right to Information Act gives you a formal route.
- Under section 6(1) of the RTI Act, 2005, a request goes in writing or by electronic means to the Public Information Officer of the public authority concerned, with the fee your state's rules prescribe.
- Under section 7(1), the officer must provide the information, or reject the request for reasons the Act allows, within thirty days of receiving it.
- Look for the officer's name on your DISCOM's website. DHBVN's RTI page, for example, lists its Public Information Officers circle by circle, including Gurugram, Faridabad and Palwal.
Ask for something the office can actually produce. A request that works covers five financial years and asks for:
- The interruption register for your feeder, showing for each interruption the date, the time supply failed, the time it was restored, whether it was planned or unplanned, and the recorded cause where available.
- The total number of interruptions on the feeder in each year, planned and unplanned separately.
- The SAIFI and SAIDI for your circle or division in each year, with the minimum interruption duration counted and whether planned outages are included.
- Copies of the standards of performance returns the licensee filed with the state commission for your circle.
Our savings calculator drafts this letter for you. Enter your site's PIN code and it addresses the request to your licensee and circle office, ready for your connection number and signature.
Why is the DG controller the best source of all?
Because it counts exactly the events that cost you diesel, at the machine that burns it, and it has been counting since the day it was fitted. Every modern DG controller keeps a lifetime start count and an engine hours total. Starts divided by the years since the controller was fitted gives roughly how many times a year your power fails long enough to start the set. Outage engine hours divided by outage starts gives roughly how long a typical cut lasts.
It is retrospective, years deep, free and on your own premises. Nobody has averaged it across a licence area or excluded anything from it. Its blind spot is the one that matters least for diesel: a cut shorter than the controller's start delay never starts the engine, so it never reaches the counter, but it never burns any fuel either.
Three corrections keep it honest: take out test runs, take out failed starts that were retried, and find out when the controller itself was fitted, because the counter belongs to the controller, not the engine. Our guide to reading the DG start counter and engine hours covers where the numbers live on Deep Sea, ComAp and Cummins PowerCommand panels, the corrections in full, and a cross-check against your fuel bill.
How do the four sources compare?
| Source | What it counts | What it misses | How long it takes |
|---|---|---|---|
| SAIFI and SAIDI | Average sustained interruptions per consumer, across a licence area or circle | Your feeder in particular; short and, in some states, planned cuts | Minutes, where published |
| Published outage reports | Recorded interruptions by area, with times | Brief interruptions; anything not recorded against your area | An hour of reading, where published |
| Feeder interruption register | Every recorded trip on your own feeder, dated | Dips the feeder record does not capture; faults inside your own plant | Days if shared; up to thirty days under RTI |
| DG controller start counter | Every cut long enough to start your genset, for years | Cuts shorter than the start delay, which burn no diesel | About ten minutes at the panel |
The feeder register and the controller are independent records of the same events, seen from either end of the cable. When they roughly agree, both are trustworthy. When they do not, the gap usually has a plain explanation: planned shutdowns the register lists separately, a controller replaced a few years ago, or trips inside the plant that never reached the DISCOM's books.
What should I do with the number?
Use it with the average cut length and your diesel invoices, not on its own. Whether a battery for the short cuts makes sense depends on all three, plus your grid tariff, and we would rather show you that arithmetic than give you a rule of thumb. If your power rarely fails, a battery will sit charged and idle, and we will say so. Our guide on reducing diesel generator cost covers the measures that suit other patterns, and the DISCOM evidence above is also the best way to press for fewer cuts on your feeder.
Get the count, free
The power cuts step of our calculator takes lifetime starts and years directly and turns them into cuts per year, then shows the full working on your own figures. Or let us read the panel for you: about ten minutes at your DG controller with your maintenance engineer, at no cost, and the data stays yours whether or not you ever buy anything from us. Ginti free mein, das minute mein. Call or WhatsApp +91 8920 110 530, or write to contact@vyut.in. More answers are on our FAQ.