How much diesel does a DG set use per hour?
A table of litres per hour by kVA and load, worked out in the open, a public reference range from the Bureau of Energy Efficiency, and why your own logbook beats both.
"How much diesel does a 500 kVA set burn in an hour?" is one of the most common questions about gensets, and most answers online are a single number with no working behind it. The honest answer depends on two things: the size of the set and how hard it is working. This guide gives a table for common sizes, shows exactly how every figure in it is worked out, and then shows why the number in your own DG logbook should replace it.
What is the short answer?
A DG set carrying 60% of its rated load burns roughly 0.13 litres an hour for every kVA on its nameplate. That is about 65 litres an hour for a 500 kVA set and about 32 litres for a 250 kVA set. At lighter loads it burns fewer litres an hour but more litres for every unit it makes, which is why a lightly loaded set is an expensive one.
The rule behind every figure on this page is one line:
Litres per hour = kVA x 0.8 x load x litres per kWh
- kVA x 0.8 turns the nameplate rating into kW. Gensets are rated in kVA at a power factor of 0.8: a Cummins India data sheet, for example, lists its 400 kVA set as 320 kWe and its 500 kVA set as 400 kWe, both at 0.8.
- Load is the share of that kW rating the set is actually carrying: 0.6 for 60%.
- Litres per kWh is how much fuel the engine needs for each unit at that load, called specific fuel consumption. Our model uses 0.300 at 40% load, 0.270 at 60% and 0.250 at 75%, with straight lines between them.
How many litres an hour does each size of set burn?
Every cell below is that rule and nothing more. Take a 500 kVA set at 60% load: 500 x 0.8 = 400 kW of rating; x 0.6 = 240 kW of load; x 0.27 litres per kWh = 64.8 litres an hour.
| Set rating | kW rating (x 0.8) | 30% load (0.315 l/kWh) | 40% load (0.300 l/kWh) | 60% load (0.270 l/kWh) | 75% load (0.250 l/kWh) |
|---|---|---|---|---|---|
| 125 kVA | 100 kW | 9.4 | 12.0 | 16.2 | 18.8 |
| 250 kVA | 200 kW | 18.9 | 24.0 | 32.4 | 37.5 |
| 320 kVA | 256 kW | 24.2 | 30.7 | 41.5 | 48.0 |
| 500 kVA | 400 kW | 37.8 | 48.0 | 64.8 | 75.0 |
| 750 kVA | 600 kW | 56.7 | 72.0 | 97.2 | 112.5 |
| 1000 kVA | 800 kW | 75.6 | 96.0 | 129.6 | 150.0 |
| 1500 kVA | 1200 kW | 113.4 | 144.0 | 194.4 | 225.0 |
Figures are litres per hour. The 30% column extends the model's line below its lowest reference point, so treat it as the roughest of the four. None of these columns is your engine: they are a starting point until you have your own numbers.
Where does 0.27 litres per kWh come from, and how does it compare?
It is the reference figure our savings model uses for a set at 60% of its rating, and it is deliberately ordinary. For an independent check, the Bureau of Energy Efficiency's guide book chapter on DG sets, written for energy auditors, includes a sample monitoring log of 22 sets of 200 to 920 kW, running at 65 to 110% of their derated capacity on high speed diesel or light diesel oil. Their specific fuel consumption ranged from 0.290 to 0.362 litres per kWh.
Two things follow. First, real sets often burn more per unit than our reference figures, so the table above is more likely to flatter your genset than to blacken it. Second, the spread is wide: sets of similar size at similar loads differed by up to a quarter. Age, maintenance, fuel quality and how steady the load is all move the figure, which is why no table can stand in for your own logbook.
The same chapter notes that alternators reach their highest efficiency at around 70% of their kVA rating and above, and its first energy saving measure is to keep the load on the set steady.
Why does a lightly loaded set cost more per unit?
Look at the 500 kVA row. At 40% load the set burns 48 litres an hour; at 60% it burns 64.8. Fewer litres at the lighter load, but it also makes far fewer units: 160 kWh in that hour instead of 240. Each unit therefore takes 0.300 litres instead of 0.270.
| 500 kVA set | 40% load | 60% load |
|---|---|---|
| Load carried | 160 kW | 240 kW |
| Litres per hour | 48.0 | 64.8 |
| Litres per kWh | 0.300 | 0.270 |
| Fuel cost per unit at ₹95.20 a litre | ₹28.56 | ₹25.70 |
Most standby sets are oversized for the load they carry during an ordinary power cut and run at 30 to 40% of rating. That is the expensive corner of the table. Our guide to what a unit from your DG set really costs adds oil, maintenance and wear to the fuel and compares the result with grid power.
How do I work out my own set's litres per hour?
You need three numbers for the same twelve months, and you probably have all of them already.
- Litres bought for the set, from a year of diesel invoices. Work in litres, not rupees, so a price change does not blur the picture.
- Engine hours run, from the controller or the hour meter: today's reading less the reading a year ago, from the logbook or an old service report.
- kWh generated, from the controller's kWh total or a meter on the DG feeder, if either exists.
Then divide. Litres divided by engine hours is your litres per hour. kWh divided by engine hours is your average load in kW. Litres divided by kWh is your litres per kWh. Divide the average load by kVA x 0.8 and you have your load as a share of rating, which tells you which column of the table your set really lives in.
A worked example with made-up round numbers. A 500 kVA set's invoices show 66,000 litres for the year; the hour meter moved by 1,100 hours; the kWh total rose by 2,20,000.
- Litres per hour: 66,000 ÷ 1,100 = 60 litres
- Average load: 2,20,000 ÷ 1,100 = 200 kW, which is 200 ÷ 400 = 50% of rating
- Litres per kWh: 66,000 ÷ 2,20,000 = 0.30, worse than the model's 0.285 at that load
One correction matters. Engine hours include routine test runs, which are usually short and lightly loaded, and the hours a set spends idling after the grid returns. If your set is exercised weekly, those hours and their litres sit inside your average. Our guide to reading the start counter and engine hours shows how to separate test runs from power cuts, and how to check the result against your fuel bill.
What does an hour of running cost?
Litres per hour multiplied by the price on your latest diesel invoice. At ₹95.20 a litre (the reference price on our site, as at 22 August 2026), the 500 kVA set at 60% load burns 64.8 litres, about ₹6,170 of fuel an hour. Adding the ₹2.00 per kWh our model carries for oil, filters, AMC and overhaul brings it to about ₹6,650. Every ₹1 change in the price of a litre moves that hour by about ₹65.
That hourly figure is what each power cut costs while the genset runs, and it is the figure a battery is set against. A battery beside the genset takes the short cuts, in under 10 milliseconds, and the genset starts only when a cut runs long. At a typical plant short cuts burn about half of the diesel, which is why the shape of your cuts matters as much as the size of your set. The genset stays for the long cuts, the fire pump and the lift: it is a backup to your genset, not a replacement for it. Our guide on battery storage vs a diesel generator explains how the two divide the work.
What else moves the number?
- Condition. Choked air filters, worn injectors and a neglected fuel system push litres per kWh up slowly enough that nobody notices. Work out units per litre every month and watch for drift.
- Site conditions. Altitude and hot intake air reduce what an engine can deliver; the BEE chapter gives correction tables for both.
- Two sets sharing a light load. Two sets at 30% burn more per unit than one at 60%. A synchronising panel that brings the second set in only when the load needs it helps.
- Diesel price. Your cost per hour moves with every invoice. Use the latest price, never a remembered one.
Our guide on reducing diesel generator cost covers what to do about each of these.
Put your own numbers in
Our savings calculator does this arithmetic for your plant. Give it your DG rating and diesel spend and it solves the load your set is running at, loads the diesel price for your industrial belt, and shows the cost of each diesel unit with the full working on the page, including when it advises against going further.
If you would rather start from measured numbers, we will read your DG controller's start counter, engine hours and kWh total for free. It takes about ten minutes at the panel with your maintenance engineer, and you keep the data whether or not you ever buy anything from us. Call or WhatsApp +91 8920 110 530, or write to contact@vyut.in. More answers are on our FAQ.
What would it save your plant?
The savings calculator runs on your diesel spend and your belt's diesel price and shows the full working, including when the answer is no.