Battery backup for diesel generators in Kochi
What a unit from your genset really costs in Kochi / Kalamassery, what the same unit costs from a battery, and how to find out in ten minutes whether it pays at your site.
About half the diesel a site in Kochi / Kalamassery burns goes on short power cuts: twenty minutes, half an hour, several times a week. Vyut is a battery energy block that sits beside your existing DG set and takes those short cuts. Chhote cuts battery lega. Lambe cut, genset, jaise aaj. The generator stays for the long cuts, the fire pump and the lift.
What a unit from your genset costs in Kochi
Diesel in Kochi / Kalamassery (Kerala) is ₹102.45 a litre, verified on 3 October 2026. A genset running at 60 percent load burns about 0.27 litres for every unit (kWh) it makes, and oil and maintenance add about ₹2 a unit on top.
| Per unit of energy (kWh) | Kochi |
|---|---|
| Diesel price, verified 3 October 2026 | ₹102.45 / litre |
| Unit from your genset, fuel plus oil and maintenance | ₹29.66 |
| Typical landed grid tariff for industrial supply (our estimate; your own bill replaces it) | ₹9.60 |
| Same unit bought from the grid and stored in the battery | ₹11.17 |
| Difference on every unit the battery carries | ₹18.49 |
That difference is the whole of the saving. It is earned every time the battery carries a short cut that your genset would otherwise have started for. How many such cuts your site sees, and how long they last, decides whether the numbers work, and that comes from your own DG controller, not from an average.
Find out in ten minutes whether it works for your site
Your genset controller has been counting every start since the day it was installed, along with engine hours. Those two numbers tell you how often the power fails and roughly how long each cut lasts. Vyut reads them free, at your DG panel, before anyone signs anything. If the numbers come back low, we tell you to keep your money.
- Today: an indicative model from the savings calculator, with Kochi's diesel price already loaded.
- Weeks 1 and 2: we measure your site at our cost from the controller, the logbook, your diesel invoices and your electricity bill.
- Week 3: a verified proposal. The saving guarantee is written only where the modelled payback is three years or better.
- Week 4: deploy and commission, subject to the units being in stock.
Run the numbers for Kochi
The calculator opens with Kochi / Kalamassery selected: its diesel price and typical grid tariff loaded, and every step of the working shown.